A bus and several cars were crushed under the rubble. On 3 July 2014, the overpass collapsed onto the busy carriageway Avenida Pedro I below. The World Cup was already unpopular in the public due to the heavy costs to tax payers. The construction began in 2010 and was scheduled to be completed in May 2014. The concrete and steel bridge was located 3 kilometers from the Mineirão, where many games at the World Cup were played. The bridge was to be part of the Move (Belo Horizonte) Bus rapid transit system. The construction project was part of infrastructural improvements meant to prepare for the 2014 FIFA World Cup that was taking place at the time of the collapse. The accident left two people dead and 22 others injured. The overpass was under construction and not open to traffic at the time. These activities include tree clearing and utility relocations.On 3 July 2014, an overpass collapsed in Belo Horizonte, Brazil onto a busy carriageway below. Pre-construction activities are on-going along Highway 400, Essa Rd and Bryne Dr. Detours will be in place for this project The City will communicate which traffic stage configuration is to be expected one week in advance of its implementation. A staging schematic is provided for reference. During this time access along Essa Road will still remain. The City will communicate these closures in a advance.įull ramp terminal closures will also be implemented for a period of 5 days to allow for interchange ramps to connect to Essa Road. This service is expected to be in place until the end of 2024.įull closures underneath the Highway 400 along Essa Road will be required on three occasions to allow for the construction of new bridge girders and the demolition of the old bridge. Pedestrians can get on the bus at bus stop 296 and 300 to the east and west of the construction limits and it will bring them to the other side. While the sidewalk along Essa Road is closed, a regularly scheduled Barrie Transit bus will bring pedestrians through the work zone for free. Starting June 20, 2022, pedestrian access will be restricted under the Highway 400. An alternative lot can be found at the northwest corner of Ardagh Dr and Essa Road. The access road that runs along the Highway 400 south of Essa Road will also be closed starting Juntil the end of Fall 2022, and the Car Pool Lot at the northeast corner of Essa Road and Highway 400 will be closed until the end of 2024. (Aecon) to complete the construction of the Essa Road Interchange Project. The MTO has hired Aecon Construction and Materials Ltd. Traffic on Essa Road under the Highway 400 bridge will be restricted to one lane in each direction starting in early or mid August. June 2022Ĭonstruction is underway. Motorists are reminded to drive cautiously through the construction zone and take alternative routes to avoid potential delays. Traffic on Essa Road under the Highway 400 Bridge is restricted to one lane in each direction. The Contractor is continuing work on Essa Road. The Contractor is continuing work on the Essa Road Interchange Bridge and is expected to return Essa Road traffic to two lanes during the week of December 12, 2022. Drinking Water Treatment & Distribution.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |